Calculated-industries 4067 User Guide Manual do Utilizador

Consulte online ou descarregue Manual do Utilizador para Calculadoras, organizers Calculated-industries 4067 User Guide. Calculated Industries 4067 User Guide User Manual Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 23
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 0
ConstruCtion Master Plus eZ
1
T
he Construction Master Plus EZ (CMP EZ) is the newest in
Calculated Industries′ line of award-winning Construction Master
Plus construction-math calculators. The big difference between the
CMP EZ and the other models is that, in addition to many more built-in
calculations, the CMP EZ is a Prompting Calculator.
With a Prompting Calculator, you select a function and then scroll
through a series of prompts for quantities, measurements, placement,
materials and other possible inputs. After entering the inputs, you can
then
scroll through all the available calculations and solutions. You
can also change an input (or multiple inputs) and then re-solve the
problem, instantly seeing how the new entry changes calculations
without having to re-enter the entire problem.
The Construction Master Plus EZ has Basic and Advanced solutions
(lengths, angles, quantities, etc.) for these construction calculations:
● Rafters
● Hip/Valley Rafters
● Jack Rafters
● Stairs
Other solutions include
● Square-Ups, Areas and Volumes
● Circular
Arcs
● Rake Walls
Arch Studs
● Balusters ─ Cap Wall and Open Wall
● Elliptical Arches
● Crown Molding
● Compound Angles
● Polygons
● Spacing
● Material Calculations for Blocks, Drywall, Fencing, Footings,
Pavers, Roong, Studs, Tile and Grout
TABLE OF CONTENTS
GETTING STARTED
.......................................................................................2
Key Denitions ..........................................................................................2
Basic Function Keys .............................................................................. 2
Dimensional Function Keys ................................................................... 2
Weight and Volume Function Keys .......................................................2
Miscellaneous Functions .......................................................................2
Construction and Prompting Keys ......................................................... 3
USING THE CONSTRUCTION MASTER PLUS EZ
......................................... 3
Default Values ...........................................................................................3
Functions — U.S. Mode ........................................................................3
Functions — Metric Mode .....................................................................3
Materials — U.S. Mode .........................................................................4
Materials — Metric Mode ......................................................................4
Extras — U.S. Mode ..............................................................................4
Square-Up and LxWxH Functions ............................................................. 4
Square-Up .............................................................................................4
Extras — Metric Mode ........................................................................... 4
LxWxH ...................................................................................................4
Rafter Function .......................................................................................... 5
Basic Rafters .........................................................................................5
Advanced Rafters ..................................................................................5
Hip/Valley Rafter Function ......................................................................... 5
Basic Hip/Valley Rafters ........................................................................ 5
Advanced Hip/Valley Rafters ................................................................. 6
Advanced Function with Common Pitch ................................................6
Advanced Function with Irregular Pitch ................................................. 6
Jack Rafter Function .................................................................................6
Basic Jack Rafters .................................................................................6
Jack Rafters – Advanced Function ........................................................ 7
Stair Function ............................................................................................ 7
Basic Stairs ...........................................................................................8
Vista de página 0
1 2 3 4 5 6 ... 22 23

Resumo do Conteúdo

Página 1 - TABLE OF CONTENTS

ConstruCtion Master Plus eZ1The Construction Master Plus EZ (CMP EZ) is the newest in Calculated Industries′ line of award-winning Construction Master

Página 2 - GettinG Started

ConstruCtion Master Plus eZ102. Start Rake Wall function:Cc3. Enter Pitch:8ie4. Enter Run:6fe5. No Base Height:e6. Accept 16″ On-Center Spacing defaul

Página 3 - ConStrUCtion MaSter PlUS eZ

ConstruCtion Master Plus eZ117. Accept Stud Location (1 = Outside) and solve for Arch Studs:eARCH CENTER STUD LNTH0 FEET 0 INCHeSTUD PAIR LENGTH Ø10 F

Página 4 - SQUARE-UP AND LxWxH FUNCTIONS

ConstruCtion Master Plus eZ121. Clear Calculator:OOO2. Start Materials function:N3. If necessary, continue pressing N until BLOCKS displays4. Start Bl

Página 5 - HIP/VALLEY RAFTER FUNCTION

ConstruCtion Master Plus eZ135. Enter 256 sq. inch default for Footing Area:256iie6. Accept 5% default value for Waste Factor and solve for Footing Vo

Página 6 - JACK RAFTER FUNCTION

ConstruCtion Master Plus eZ149. Accept 16" default value for Stud On-Center Spacing: e10. Accept 5% default value for Waste Factor and solve for

Página 7 - STAIR FUNCTION

ConstruCtion Master Plus eZ15Fourth press of e:(Volume answer format preference) VOLUME UNITS STD. 0.vVOLUME UNITS CU YD 0.vVOLUME UNITS CU FEET 0.vV

Página 8

ConstruCtion Master Plus eZ163. Start Crown Molding function:e4. Enter Corner Angle of 60º:60e5. Enter 38º Spring Angle and solve for Crown Molding:38

Página 9 - RAKE WALL FUNCTION

ConstruCtion Master Plus eZ171. Clear Calculator:OOO2. Go to Extras function:CN (If necessary, continue pressing N until SPACING displays.)3. Start Sp

Página 10 - ARCH STUD FUNCTION

ConstruCtion Master Plus eZ186) Rake Wall Display Order– DESCENDING RAKE: Rake Wall studs are displayed from largest to smallest size.– ASCENDING RAKE

Página 11 - MATERIALS FUNCTIONS

ConstruCtion Master Plus eZ19Weight per Volume ConversionsFind the weight of 15 cubic yards of gravel. The gravel weighs 1.75 tons per cubic Yard.Note

Página 12 - Optional Entries

ConstruCtion Master Plus eZ2GettinG StartedKEY DEFINITIONSBasic Function KeysOOn/Clear Key – Turns on power. When not in a prompting sequence, pressin

Página 13

ConstruCtion Master Plus eZ20THE WARRANTY WILL NOT APPLY TO THE PRODUCT IF IT HAS BEEN DAMAGED BY MISUSE, ALTERATION, ACCIDENT, IMPROPER HANDLING OR O

Página 14 - DESCRIPTION DEFAULT

ConstruCtion Master Plus eZ218' 1" Chord Length2' 10"ArchHeight42' 10-1/2"42' 10-1/2"32' 9-1/8"32&ap

Página 15

ConstruCtion Master Plus eZ224' RiseØ1 Ø2 Ø3 Ø4 Ø53' 10-11/16"2' 11-1/2"2' 7/8"1' 2-3/16"3' 1/2&

Página 16

ConstruCtion Master Plus eZ23Upper Flooring ThicknessLowerFlooring ThicknessNosing LengthTread WidthRiserThicknessRiserHeightInclinationAngleToe Posit

Página 17 - Appendix A

ConstruCtion Master Plus eZ3Construction and Prompting KeysComplete listings of required and optional entries and the resulting solutions are in the C

Página 18 - Appendix B

ConstruCtion Master Plus eZ4Materials — U.S. ModeBlocks• Block Height 8″• Block Length 16″• Waste Factor 5%Drywall Sheets• Include Ceiling: 1 =

Página 19 - REPAIR AND RETURN

ConstruCtion Master Plus eZ5RAFTER FUNCTIONBasic RaftersRequired Entries Possible SolutionsTwo of these required:• Pitch• Run (or Span) • Rise • Commo

Página 20

ConstruCtion Master Plus eZ6eCOMMON CHEEK ANGL38.66°eIRREGULAR CHEEK ANGL51.34°Advanced Hip/Valley RaftersRequired Entries Possible SolutionsTwo of

Página 21 - ConstruCtion Master Plus eZ

ConstruCtion Master Plus eZ7eJACK RAFTER C-Ø15 FEET 7-5/16 INCHeJACK RAFTER C-Ø24 FEET 0-1/16 INCHeJACK RAFTER C-Ø32 FEET 4-7/8 INCH eJACK RAFTER C-Ø

Página 22 - Spacing function

ConstruCtion Master Plus eZ8Basic StairsRequired Entries Possible SolutionsOne of these two required:• Floor-to-Floor Rise• Stair Run Target/Max Riser

Página 23 - Cap Wall balusters

ConstruCtion Master Plus eZ98. Accept default 80" Headroom Height:e9. Enter 3/4" Upper Flooring Thickness:3/4ie10. Enter 1-1/4" Lower F

Comentários a estes Manuais

Sem comentários